Skip to main content
Storm Season
Zero electricity costs, even in emergenciesDon't get caught in the darkBe prepared
LuminoKrom photoluminescent path marking for councils
First LuminoKrom Installer in Australia & Oceania

Photoluminescent Path Marking for Councils

Bike paths, shared pathways & pedestrian infrastructure

LuminoKrom photoluminescent path marking delivers up to 10 hours of glow after sunset with up to 80m visibility range. Zero ongoing electricity costs, Class G certified (highest international standard), and proven in Australian conditions at Blacktown City Council.

  • Up to 10 hours of glow after sunset
  • Up to 80m visibility range
  • Zero ongoing electricity costs
  • ISO 17398 Class G certified

1st

LuminoKrom Installer in Australia & Oceania

Up to 10h

Hours of Glow After Sunset

Up to 80m

Visibility Range

99.5%

Lower Carbon Footprint

5+ Years

Expected Lifespan

Council Challenges, Solved

LuminoKrom addresses the most common infrastructure challenges councils face with path safety.

Challenge:

Path construction costs $2-3.9M/km

LuminoKrom Solution:

LuminoKrom adds visibility without $50-100K+ lighting infrastructure per km

Challenge:

Remote path sections far from power

LuminoKrom Solution:

No electrical infrastructure required - charges from daylight alone

Challenge:

Environmental sensitivity in reserves

LuminoKrom Solution:

No light pollution, wildlife-friendly, zero ecosystem disruption

Challenge:

Budget constraints for safety upgrades

LuminoKrom Solution:

50x less expensive than traditional street lighting infrastructure

Challenge:

Net-zero and sustainability targets

LuminoKrom Solution:

99.5% lower carbon footprint, zero ongoing electricity consumption

Infrastructure Cost Comparison

LuminoKrom eliminates the biggest costs: electrical infrastructure and ongoing energy bills.

Mains-Powered

  • Trenching & cabling$50-100K+/km
  • Poles/luminaires$2-5K each
  • Electrical connection$5-15K
  • Annual electricity$2-5K/year
  • Installation timeWeeks-months
  • Road closuresUsually required

Solar Lighting

  • Trenching & cabling$0
  • Poles/luminaires$1-3K each
  • Electrical connection$0
  • Annual electricity$0/year
  • Installation timeHours-days
  • Road closuresNot required

LuminoKrom

  • Trenching & cabling$0
  • Poles/luminaires$0
  • Electrical connection$0
  • Annual electricity$0/year
  • Installation timeHours (line marking)
  • Road closuresMinimal

Our Dual-Technology Approach

We combine advanced photoluminescent marking with solar lighting for complete pathway safety solutions.

Primary

LuminoKrom

Photoluminescent Path Marking

Key Benefits

  • Up to 10 Hours VisibilityISO 17398 Class G certified glow provides clear wayfinding all night.
  • Zero Infrastructure CostNo poles, trenching, or electrical connection - just path marking.
  • 5+ Year LifespanDurable road-grade marking designed for high-traffic shared paths.

Ideal For

Bike path edges & centerlinesShared pathway delineationPedestrian crossings at parksTrail wayfinding through reserves
Complementary

Solar Lighting

Active Illumination

Key Benefits

  • Full Area IlluminationActive lighting for areas requiring broader visibility coverage.
  • Multi-Night AutonomyContinues working through overcast days depending on model and conditions.
  • Rapid DeploymentInstall in hours without road closures or council disruption.

Ideal For

Park gathering areasCar parksPlayground perimetersTransit stops

Technical Specifications

Verified performance data for council tender documentation.

Luminance Performance

  • +3000 mcd/m² at 2 minutes
  • +80 mcd/m² at 1 hour
  • Up to 80m visibility range

Safety Certified

  • Anti-slip coefficient >0.55
  • NF EN1436 certified
  • ISO 17398 Class G

Environmental Impact

  • 99.5% lower carbon footprint
  • Zero electricity consumption
  • No light pollution

Durability

  • 5+ years lifespan
  • Weather resistant
  • UV stable formulation

Featured Case Study

Blacktown City Council

Australia's first LuminoKrom installation - pioneering photoluminescent path marking in the country.

1st

Installation in Australia

2

Path Sites Completed

Up to 10h

Glow Duration

Up to 80m

Visibility Range

LuminoKrom photoluminescent path marking glowing at night in Blacktown

Blacktown City Council, Western Sydney, NSW

LuminoKrom path marking installation at Blacktown
Photoluminescent paint application process
LuminoKrom cycleway marking
Completed path marking at dusk

Installation Videos

LuminoKrom Application Process

Night-Time Glow Effect

Application Process

Professional installation ensures optimal luminescence and durability.

1

Surface Preparation

Clean, dry surface free of dust, dirt, and oil. Proper preparation ensures adhesion and longevity.

2

Base Coat

White undercoat applied at 400g/m² for optimal luminosity and colour vibrancy.

3

Apply LuminoKrom

Minimum 900g/m² using spray/airless machine at 1.2-2 km/h for even coverage.

4

Ready for Traffic

Touch dry in ~45 minutes. Ready for foot and bike traffic within 24 hours.

Ready to Light Your Paths Without Electricity?

Get complete tender documentation, technical specifications, and project pricing. Our team supports councils through the entire procurement process.